NARA Discovery
Article Details
← Back to Search Results
Journal Article

A Flexible Scheduling for Twin Yard Cranes at Container Terminals Considering Dynamic Cut-Off Time

Junjun Li; Jingyu Yang; Bowei Xu; Wenjun Yin; Yongsheng Yang; Junfeng Wu; Ye Zhou; Yi Shen
Journal of Marine Science and Engineering · Vol. 10, Issue 5 · pp. 675 · 2022

Abstract

Yard handling is an important part of port logistics and affects the overall efficiency of the container port. The yard crane scheduling is affected by various external factors. For example, the dynamic cut-off time makes the release time of yard cranes variable, and the yard crane task arrangement will change frequently, resulting in a lot of computational time. To increase the flexibility of container yard handling, a twin yard cranes scheduling model is established considering the no-crossing constraints and the dynamic cut-off time. A joint scheduling of PSO and local re-scheduling strategy (LRPSO) is put forward to deal with the problem faster and more effectively. Small-scale and large-scale experiments are simulated to verify the performance of the proposed method. Results show that the scheduling method is more efficient.

Bibliographic Information

JournalJournal of Marine Science and Engineering
PublisherMDPI
Publication Date2022-05-16
Publication Year2022
Volume10
Issue5
Pages675
Document TypeJournal Article
eISSN2077-1312
DOI10.3390/jmse10050675
SubjectMarine science; oceanography; marine engineering; coastal science; marine environment

Access Information

NARA Access CoverageOA / free full text
Journal Homepagehttps://www.mdpi.com/journal/jmse
Publisher PageOpen Publisher Page
This article is openly available from the publisher.