NARA Discovery
Article Details
← Back to Search Results
Journal Article

Predicting microcystin concentration action-level exceedances resulting from cyanobacterial blooms in selected lake sites in Ohio

Donna S. Francy; Amie M.G. Brady; Erin A. Stelzer; Jessica R. Cicale; Courtney Hackney; Harrison D. Dalby; Pamela Struffolino; Daryl F. Dwyer
Environmental Monitoring and Assessment · Vol. 192, Issue 8 · 2020

Abstract

Cyanobacterial harmful algal blooms and the toxins they produce are a global water-quality problem. Monitoring and prediction tools are needed to quickly predict cyanotoxin action-level exceedances in recreational and drinking waters used by the public. To address this need, data were collected at eight locations in Ohio, USA, to identify factors significantly related to observed concentrations of microcystins (a freshwater cyanotoxin) that could be used in two types of site-specific regression models. Real-time models include easily or continuously-measured factors that do not require that a sample be collected; comprehensive models use a combination of discrete sample-based measurements and real-time factors. The study sites included two recreational sites and six water treatment plant sites. Real-time models commonly included variables such as phycocyanin, pH, specific conductance, and streamflow or gage height. Many real-time factors were averages over time periods antecedent to the time the microcystin sample was collected, including water-quality data compiled from continuous monitors. Comprehensive models were useful at some sites with lagged variables for cyanobacterial toxin genes, dissolved nutrients, and (or) nitrogen to phosphorus ratios. Because models can be used for management decisions, important measures of model performance were sensitivity, specificity, and accuracy of estimates above or below the microcystin concentration threshold standard or action level. Sensitivity is how well the predictive tool correctly predicts exceedance of a threshold, an important measure for water-resource managers. Sensitivities > 90% at four Lake Erie water treatment plants indicated that models with continuous monitor data were especially promising. The planned next steps are to collect more data to build larger site-specific datasets and validate models before they can be used for management decisions.

Bibliographic Information

JournalEnvironmental Monitoring and Assessment
PublisherSpringer
Publication Date2020-08-01
Publication Year2020
Volume192
Issue8
Document TypeJournal Article
eISSN1573-2959
DOI10.1007/s10661-020-08407-x

Access Information

NARA Access Coverage1981-01-01~Current
Journal Homepagehttps://www.springer.com/journal/10661
Publisher PageOpen Publisher Page
Full-text access depends on NARA's subscribed coverage and institutional access.